Reference

Bilder
2FRAPfoertner3FRA1FRA A380 Werft3tFRA A380 Werft4
Project
Frankfurt International Airport, Germany
Customer
Deutsche Lufthansa AG
Costs
19.8 million €
Timeline
2004 – 2008
Description

Site development including maintenance apron (approx. 74.000 m²) including 400 Hz supply for three aircraft parking lots, internal roads, parking places (approx. 30.000 m²), area lighting, surface drainage systems,waste and domestic water systems, heating and gas supply, illumination of the apron and general traffic areas. Next to the periferical fence a central gatehouse  (approx. 460 m²) was to be planned as well as the site development for a warehouse for aircraft spare parts adn a blast deflector.

Contribution

Conceptual design, Preliminary design, Layout planning, Permitting documentation, Tender documentation, Cost evaluation, Site supervision, Project management, Final documentation